Mar 18- Mar 22
Jump to navigation
Jump to search
Mar 19- (2 hours) Today I insulated the rim of the tank with foam. After that I cut some light guides at 4 inches each and squared the ends with sandpaper. Then I straightened them by pouring hot water on them and then cool water while being tied to a straight piece of metal.
Mar 21- (2 hours) I attended the weekly meeting today.
Mar 22- (1 hour) Took apart the computers for the fans.