Current Tasks

From UConn PAN
Revision as of 15:04, 24 September 2012 by Mcintyre (talk | contribs) (Created page with '<big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br> <big>**UNDER CONSTRUCTION**</big> 1. Place-Holder<br> 2. Place-Holder<br> 3. Setup t…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Main tasks to be accomplished in the near future, as of 9/24/2012:

**UNDER CONSTRUCTION**

1. Place-Holder
2. Place-Holder
3. Setup the CODA station
4. Prototype the bias voltage compensator circuit
5. Electronics boards revisions
6. Revise the prototype preamp for 50 micron SiPMs for gain correction
7. Water cooling: Design and build

Parallel to these tasks:

  • Study for QM Prelim
  • Prepare for the oral exam
  • Place-Holder
  • Place-Holder