Difference between revisions of "Mar 18- Mar 22"

From UConn PAN
Jump to navigation Jump to search
m
m
Line 1: Line 1:
'''Mar 19- 2 hours''' Today I insulated the rim of the tank with foam. After that I cut some light guides at 4 inches each and squared the ends with sandpaper. Then I straightened them by pouring hot water on them and then cool water while being tied to a straight piece of metal.
+
'''Mar 19- (2 hours)''' Today I insulated the rim of the tank with foam. After that I cut some light guides at 4 inches each and squared the ends with sandpaper. Then I straightened them by pouring hot water on them and then cool water while being tied to a straight piece of metal.
  
'''Mar 21''' I attended the weekly meeting today.
+
'''Mar 21- (2 hours)''' I attended the weekly meeting today.

Revision as of 20:36, 21 March 2013

Mar 19- (2 hours) Today I insulated the rim of the tank with foam. After that I cut some light guides at 4 inches each and squared the ends with sandpaper. Then I straightened them by pouring hot water on them and then cool water while being tied to a straight piece of metal.

Mar 21- (2 hours) I attended the weekly meeting today.