Difference between revisions of "Feb 11- Feb 15"

From UConn PAN
Jump to navigation Jump to search
m (Created page with ''''Feb 14th-''' After the weekly meeting Ann Marie and I replaced the covers of the lights in the clean room with UV filtering covers. We soon realized that the length of two lig…')
 
m
Line 1: Line 1:
'''Feb 14th-''' After the weekly meeting Ann Marie and I replaced the covers of the lights in the clean room with UV filtering covers. We soon realized that the length of two lights were shorter than the other four. Brendan cut the UV plastic tubes and I then assisted Ann Marie install the new covers.  
+
'''Feb 14th- (2.5 hours)''' After the weekly meeting Ann Marie and I replaced the covers of the lights in the clean room with UV filtering covers. We soon realized that the length of two lights were shorter than the other four. Brendan cut the UV plastic tubes and I then assisted Ann Marie install the new covers.  
  
 
'''Feb 15th-''' Ann Marie and I were going to clean the tank today, but as I arrived, Ann Marie was discovering that a reaction was occurring when the tank was cleaned with the chemical we were using, so we did not clean the tank.
 
'''Feb 15th-''' Ann Marie and I were going to clean the tank today, but as I arrived, Ann Marie was discovering that a reaction was occurring when the tank was cleaned with the chemical we were using, so we did not clean the tank.

Revision as of 19:34, 14 March 2013

Feb 14th- (2.5 hours) After the weekly meeting Ann Marie and I replaced the covers of the lights in the clean room with UV filtering covers. We soon realized that the length of two lights were shorter than the other four. Brendan cut the UV plastic tubes and I then assisted Ann Marie install the new covers.

Feb 15th- Ann Marie and I were going to clean the tank today, but as I arrived, Ann Marie was discovering that a reaction was occurring when the tank was cleaned with the chemical we were using, so we did not clean the tank.