Difference between revisions of "Apr 8- Apr 12"

From UConn PAN
Jump to navigation Jump to search
m
m
Line 1: Line 1:
 
'''Apr 11 (3.5 hours)''' After the meeting, I uploaded all of the Post-Alcohol Test photos of both light guide and scintillating fibers onto the Google Drive.
 
'''Apr 11 (3.5 hours)''' After the meeting, I uploaded all of the Post-Alcohol Test photos of both light guide and scintillating fibers onto the Google Drive.
  
'''Apr 12 (1.5 hours)''' Today I created links for all of the Post-Alcohol Test photos into the Excel spreadsheet.
+
'''Apr 12 (1.5 hours)''' Today I created links for all of the Post-Alcohol Test photos into the Excel spreadsheet. I also neatened the spreadsheet of the breaking mass and remade the Historgram.  Afterwards I helped Ann Marie record the breaking masses of 9 newly fused light guides.

Revision as of 18:51, 18 April 2013

Apr 11 (3.5 hours) After the meeting, I uploaded all of the Post-Alcohol Test photos of both light guide and scintillating fibers onto the Google Drive.

Apr 12 (1.5 hours) Today I created links for all of the Post-Alcohol Test photos into the Excel spreadsheet. I also neatened the spreadsheet of the breaking mass and remade the Historgram. Afterwards I helped Ann Marie record the breaking masses of 9 newly fused light guides.