Difference between revisions of "Current Tasks"

From UConn PAN
Jump to navigation Jump to search
Line 2: Line 2:
  
  
1. Revise the QA Plan<br>
+
1. Revise the QA Plan<br>
2. TDR<br>
+
2. TDR<br>
3. Beamline paper<br>
+
3. Beamline paper<br>
4. Offset plate design<br>
+
4. Offset plate design<br>
5. Generate an equipment list & AutoCAD drawings based on construction plan<br>
+
5. Generate an equipment list & AutoCAD drawings based on construction plan<br>
    - Dark-box plate (backplane mount)
+
    - Dark-box plate (backplane mount)
    - straightening collars (6x6 design?; must stay with plate except during end-milling)
+
    - straightening collars (6x6 design?; must stay with plate except during end-milling)
    - bundle collars
+
    - bundle collars
    - offset plates
+
    - offset plates
    - chimneys
+
    - chimneys
    - chimney-guides
+
    - chimney-guides
    - hole locations for base & chimney plates
+
    - hole locations for base & chimney plates
    - bundle shipping boxes & interior foam
+
    - bundle shipping boxes & interior foam
    - gluing block
+
    - gluing block
6. Design testing equipment (bundles & single fibers)<br>
+
6. Design testing equipment (bundles & single fibers)<br>
7. Design dark-cloth<br>
+
7. Design dark-cloth<br>
7. Build intermediate storage box<br>
+
8. Build intermediate storage box<br>
5. Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br>
+
9. Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br>
6. Provide mechanical drawings for parts on the equipment list<br>
+
10. Provide mechanical drawings for parts on the equipment list<br>
    - get onto machining list
+
    - get onto machining list
7. Generate data sheets needed based on construction plan<br>
+
11. Generate data sheets needed based on construction plan<br>
8. Generate Excel sheets for construction timelines<br>
+
12. Generate Excel sheets for construction timelines<br>
9. Generate design for gpu cooling system<br>
+
13. Generate design for gpu cooling system<br>
10. Order: <br>
+
14. Order: <br>
    - piping components for heat treating fibers
+
    - piping components for heat treating fibers
    - components for gpu cooling
+
    - components for gpu cooling
    - materials for dark-box
+
    - materials for dark-box
    - stock for: collars, offset plates, chimneys
+
    - stock for: collars, offset plates, chimneys
    - spring-plates
+
    - spring-plates
    - springs
+
    - springs
    - foam (shipping boxes)
+
    - foam (shipping boxes)
    - cardboard boxes (bundles & spools)
+
    - cardboard boxes (bundles & spools)
    - hinges (dark-box, storage box)  
+
    - hinges (dark-box, storage box)  
    - handles (dark-box, storage box)
+
    - handles (dark-box, storage box)
    - clamps (dark-box, storage box)
+
    - clamps (dark-box, storage box)
    - Velcro, snaps, cloth material
+
    - Velcro, snaps, cloth material
    - mylar for optical box & bundle ends  
+
    - Mylar for optical box & bundle ends  
11. Place-Holder<br>
+
 
12. Place-Holder<br>
 
  
 
<big>'''Parallel to these tasks''':</big><br>
 
<big>'''Parallel to these tasks''':</big><br>

Revision as of 22:17, 5 October 2012

Main tasks to be accomplished in the near future, as of 9/24/2012:


1. Revise the QA Plan
2. TDR
3. Beamline paper
4. Offset plate design
5. Generate an equipment list & AutoCAD drawings based on construction plan

    - Dark-box plate (backplane mount)
    - straightening collars (6x6 design?; must stay with plate except during end-milling)
    - bundle collars
    - offset plates
    - chimneys
    - chimney-guides
    - hole locations for base & chimney plates
    - bundle shipping boxes & interior foam
    - gluing block

6. Design testing equipment (bundles & single fibers)
7. Design dark-cloth
8. Build intermediate storage box
9. Update the design for the optical enclosure of the tagger microscope to fit the fixed array
10. Provide mechanical drawings for parts on the equipment list

    - get onto machining list

11. Generate data sheets needed based on construction plan
12. Generate Excel sheets for construction timelines
13. Generate design for gpu cooling system
14. Order:

    - piping components for heat treating fibers
    - components for gpu cooling
    - materials for dark-box
    - stock for: collars, offset plates, chimneys
    - spring-plates
    - springs
    - foam (shipping boxes)
    - cardboard boxes (bundles & spools)
    - hinges (dark-box, storage box) 
    - handles (dark-box, storage box)
    - clamps (dark-box, storage box)
    - Velcro, snaps, cloth material
    - Mylar for optical box & bundle ends 


Parallel to these tasks:

  • Study for QM Prelim
  • Prepare for the oral exam
  • Workout more