Difference between revisions of "UConn PAN:Community Portal"

From UConn PAN
Jump to navigation Jump to search
m
Line 51: Line 51:
 
*Electronics prototype test on bench -Anne Marie Caroll
 
*Electronics prototype test on bench -Anne Marie Caroll
 
*Pulser carriage controls and tests -John Turner
 
*Pulser carriage controls and tests -John Turner
 +
 +
 +
=== Milestones for papers ===
 +
 +
* Jim: Beamline overview:
 +
** mid-Sept: transition to majority of time devoted to the paper
 +
** Oct 15th: Draft for internal group circulation ready
 +
** Nov 1st: Draft ready for Beamline Working Group review
 +
* Alex:
 +
** Sept 1st: Electronics package sent out for production, transition to full-time paper-writing
 +
** Sept 15th: Draft ready for group review

Revision as of 22:01, 10 August 2011

This area contains pages that are restricted to members of the UConn PAN community. Visitors are invited to browse through other sections of this web site.


Spring 2011 Beam Test Manual






Editing instructions for private pages

When creating any pages that link from this site, be sure to prefix the page name with the string Private: as in [[Private:Minutes of Conference Calls|Minutes of Conference Calls]]. The same should be done for any additional pages created underneath them as well. The Private namespace is used to prevent the content in this area from being visible to non-members.

Agenda

A list of open projects and their owners that are to be completed in high priority.

  • CHESS proposal Igor Senderovich
  • Install @ JLab
  • Sinmat/UConn Proposal -Richard Jones
  • Laser Cutting of Diamond Brendan Pratt
    1. Machine ablation chamber, optic mount, diamond mount, Plexiglas cover, and translation mount
    2. Revisit LabView software and finish raster program
    3. Test 15V trigger pulse from transformer
    4. Install gas cabinet
  • Electronics (re)design Alex Barnes
  • Diamond Mounting -Chris Pelletier, Fridah Mokaya
  • Electronics prototype test on bench -Anne Marie Caroll
  • Pulser carriage controls and tests -John Turner


Milestones for papers

  • Jim: Beamline overview:
    • mid-Sept: transition to majority of time devoted to the paper
    • Oct 15th: Draft for internal group circulation ready
    • Nov 1st: Draft ready for Beamline Working Group review
  • Alex:
    • Sept 1st: Electronics package sent out for production, transition to full-time paper-writing
    • Sept 15th: Draft ready for group review