Difference between revisions of "Weekly Goals"

From UConn PAN
Jump to navigation Jump to search
Line 10: Line 10:
  
 
=== 9/19/07 - 9/26/07 ===
 
=== 9/19/07 - 9/26/07 ===
 +
<table>
 +
<tr>
 +
<td>TASK</td>
 +
<td>STATUS</td>
 +
</tr>
 +
<tr>
 +
<td>*research various methods of fringe pattern analysis</td>
 +
<td></td>
 +
</tr>
 +
<tr>
 +
<td>*post findings on the wiki</td>
 +
<td></td>
 +
</tr>
 +
<tr>
 +
<td>*begin running parSA tests on the cluster</td>
 +
<td></td>
 +
</tr>
 +
<tr>
 +
<td>*formulate a plan to determine the best parSA scheduler for the project</td>
 +
<td></td>
 +
</tr>
 +
</table>
 +
 
* research various methods of fringe pattern analysis
 
* research various methods of fringe pattern analysis
 
* post findings on the wiki
 
* post findings on the wiki
 
* begin running parSA tests on the cluster
 
* begin running parSA tests on the cluster
 
* formulate a plan to determine the best parSA scheduler for the project
 
* formulate a plan to determine the best parSA scheduler for the project

Revision as of 17:38, 26 September 2007

Carl's Weekly Goals

9/12/07 - 9/19/07

  • test polishing techniques on the square fibers
  • Test BC-600 epoxy and compare to 20-3238
  • research electroplating to coat the scintillators and waveguides
  • continue to post my results on the wiki

Matt's Weekly Goals

9/19/07 - 9/26/07

TASK STATUS
*research various methods of fringe pattern analysis
*post findings on the wiki
*begin running parSA tests on the cluster
*formulate a plan to determine the best parSA scheduler for the project
  • research various methods of fringe pattern analysis
  • post findings on the wiki
  • begin running parSA tests on the cluster
  • formulate a plan to determine the best parSA scheduler for the project