Difference between revisions of "Current Tasks"

From UConn PAN
Jump to navigation Jump to search
(Created page with '<big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br> <big>**UNDER CONSTRUCTION**</big> 1. Place-Holder<br> 2. Place-Holder<br> 3. Setup t…')
 
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
<big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br>
 
<big>'''Main tasks to be accomplished in the near future, as of 9/24/2012''':</big><br>
  
<big>[[**UNDER CONSTRUCTION**]]</big>
 
  
1. Place-Holder<br>
+
1. Revise the QA Plan<br>
2. Place-Holder<br>
+
2. TDR<br>
3. Setup the CODA station<br>
+
3. Beamline paper<br>
4. Prototype the bias voltage compensator circuit<br>
+
4. Offset plate design<br>
5. Electronics boards revisions<br>
+
5. Generate an equipment list & AutoCAD drawings based on construction plan<br>
6. Revise the prototype preamp for 50 micron SiPMs for gain correction<br>
+
    - Dark-box plate (backplane mount)
7. Water cooling: Design and build<br>
+
    - straightening collars (6x6 design?; must stay with plate except during end-milling)
 +
    - bundle collars
 +
    - offset plates
 +
    - chimneys
 +
    - chimney-guides
 +
    - hole locations for base & chimney plates
 +
    - bundle shipping boxes & interior foam
 +
    - gluing block
 +
6. Design testing equipment (bundles & single fibers)<br>
 +
7.  Design dark-cloth<br>
 +
8.  Build intermediate storage box<br>
 +
9.  Update the design for the optical enclosure of the tagger microscope to fit the fixed array<br>
 +
10. Provide mechanical drawings for parts on the equipment list & get on machining list<br>
 +
11. Generate data sheets needed based on construction plan<br>
 +
12. Generate Excel sheets for construction timelines<br>
 +
13. Generate design for gpu cooling system<br>
 +
14. Order: <br>
 +
    - piping components for heat treating fibers
 +
    - components for gpu cooling
 +
    - materials for dark-box
 +
    - stock for: collars, offset plates, chimneys
 +
    - spring-plates
 +
    - springs
 +
    - foam (shipping boxes)
 +
    - cardboard boxes (bundles & spools)
 +
    - hinges (dark-box, storage box)
 +
    - handles (dark-box, storage box)
 +
    - clamps (dark-box, storage box)
 +
    - Velcro, snaps, cloth material
 +
    - Mylar for optical box & bundle ends
 +
 
  
 
<big>'''Parallel to these tasks''':</big><br>
 
<big>'''Parallel to these tasks''':</big><br>
Line 15: Line 44:
 
*Study for QM Prelim<br>
 
*Study for QM Prelim<br>
 
*Prepare for the oral exam<br>
 
*Prepare for the oral exam<br>
*Place-Holder<br>
+
*Workout more<br>
*Place-Holder<br>
 

Latest revision as of 22:21, 5 October 2012

Main tasks to be accomplished in the near future, as of 9/24/2012:


1. Revise the QA Plan
2. TDR
3. Beamline paper
4. Offset plate design
5. Generate an equipment list & AutoCAD drawings based on construction plan

    - Dark-box plate (backplane mount)
    - straightening collars (6x6 design?; must stay with plate except during end-milling)
    - bundle collars
    - offset plates
    - chimneys
    - chimney-guides
    - hole locations for base & chimney plates
    - bundle shipping boxes & interior foam
    - gluing block

6. Design testing equipment (bundles & single fibers)
7. Design dark-cloth
8. Build intermediate storage box
9. Update the design for the optical enclosure of the tagger microscope to fit the fixed array
10. Provide mechanical drawings for parts on the equipment list & get on machining list
11. Generate data sheets needed based on construction plan
12. Generate Excel sheets for construction timelines
13. Generate design for gpu cooling system
14. Order:

    - piping components for heat treating fibers
    - components for gpu cooling
    - materials for dark-box
    - stock for: collars, offset plates, chimneys
    - spring-plates
    - springs
    - foam (shipping boxes)
    - cardboard boxes (bundles & spools)
    - hinges (dark-box, storage box) 
    - handles (dark-box, storage box)
    - clamps (dark-box, storage box)
    - Velcro, snaps, cloth material
    - Mylar for optical box & bundle ends 


Parallel to these tasks:

  • Study for QM Prelim
  • Prepare for the oral exam
  • Workout more